Browse all practice questions for the CSI Construction Documents Technology (CDT) Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

CSI Construction Documents Technology (CDT) Practice Exam 2026 - Free CDT Practice Questions and Study Guide course image
All questions

These questions are part of the practice quiz. Start practicing

  • Which term best describes a portion of work priced separately to provide an owner option?
  • Who is primarily responsible for project site safety according to the material?
  • Who initiates a project, assumes risk, and provides funding?
  • Which statement describes Total Project Commissioning's status during construction?
  • Which item is listed as part of Preconstruction Submittals?
  • Which GreenFormat section would contain Manufacturer Sustainability Policies?
  • Which deliverables are included in Design Development?
  • Which items survive final payment, completion, acceptance of work, and termination?
  • The Leadership in Energy and Environmental Design (LEED) certification is administered by which organization?
  • During Construction, who is responsible for project coordination and compliance with project documents?
  • Which statement describes merchantability?
  • Contract Requirements include which items?
  • Which of the following is a construction bond type listed in the material?
  • What are the two phases of the Design stage?
  • Which team furnishes the materials and products for the facility to be constructed?
  • Which party is responsible for producing procurement and construction documents and administering the construction contract?
  • Resolving Claims: Who ensures it is clearly documented and often generates a written summary response with proposed scheduling for resolving?
  • Cash Allowance is?
  • What is the Medium Level 2 designation for Unit Masonry?
  • Building Systems Commissioning becomes involved at what stage of the project?
  • What is the primary function of the Conditions of the Contract?
  • Where are substitution procedures specified?
  • Which of the following is NOT listed as a pricing category?
  • Instructions for Procurement describe what?
  • Life Cycle Costs include which elements?
  • SectionFormat organizes specification information into which three primary parts?
  • Record drawings are
  • The National CAD Standard is associated with which drawing system?
  • Termination by Owner for Convenience typically results in what compensation to the contractor?
  • Addenda serve to do what?
  • AIA instruments of change include which items?
  • Which term refers to a contract element that must, in many cases, be memorialized in writing?
  • Which statement best describes the phrase 'Estimate is not a price'?
  • Post Occupancy Evaluation is conducted by which role and when after occupancy?
  • In the Facility Life Cycle, which stage follows Design and precedes Procurement?
  • Process Equipment Subgroup covers which sections?
  • BEES is used to evaluate what aspect of building products?
  • Which item is included in the Project Identification section?
  • Which item described in procurement information is not contract documents?
  • Construction Documents include two major types of documents. What are they?
  • Procurement - Available Information means?
  • Which factors are considered when determining the Project Delivery method?
  • Addenda Format covers changes to which items?
  • What is a primary purpose of liquidated damages in a construction contract?
  • In Post-Final Completion, what actions may the Owner take?
  • Part 2 - Products describes what?
  • Procurement Requirements include which elements?
  • After Final Completion, what is the status of the contract?
  • Cost Estimate is?
  • Termination by Contractor for Cause occurs under which condition?
  • Construction Drawings consist of which of the following?
  • Which statement best describes the Owner's role during Construction?
  • An Alternate in project scope is best described as?
  • Which statement best describes a Successful Project?
  • Which item is not listed as part of the Project Record Document?
  • What is a surety bond?
  • What are Hard Costs?
  • Resource Drawings are used to show construction that is related to the work but is not indicated in the contract.
  • Which section would most likely include submittals?
  • In the Facility Life Cycle, which stage follows Procurement?
  • Cost Estimate Techniques include which of the following?
  • Which team is responsible for constructing the facility and coordinating labor, subcontractors, and suppliers?
  • Division 01 - General Requirements covers which of the following?
  • Earthwork and related topics in Site and Infrastructure Subgroup are in which section range?
  • What is the focus of Design Development?
  • Termination by Owner for Cause results in what outcome?
  • Alternates are best described as which of the following?
  • What mood is recommended for use in specifications?
  • Who must document and promptly notify the contractor of any defect?
  • Facility programming considers which four aspects?
  • In Schematic Design, which elements are established?
  • In the UniFormat examples, what does the code B30 correspond to?
  • What is the purpose of Retainage?
  • Which approach is used to prepare the Construction Budget according to the material?
  • Unit Prices are used for which purpose?
  • What is the purpose of Supplementary Conditions?
  • Which coverage provides protection for both bodily injury and property damage?
  • Liquidated damages are typically described as what concept?
  • Under which subgroup do Existing Conditions, Masonry, Metals, and related topics fall?
  • Which item is commonly classified as a Soft Cost?
  • Which term refers to the broad protection across different policies, not tied to a single line of coverage?
  • Which type of policy comprises a variety of policies providing broad protection?
  • Invitation to Bid describes which?
  • The 50-division MasterFormat is primarily used for which purposes?
  • Which term describes a uniform classification system used to organize preliminary construction information by systems or assemblies?
  • Which statement about life cycle costs is accurate?
  • How is Construction defined in this context?
  • Bid evaluation is conducted per procedures set forth in which document?
  • For contractor entitlement, what are the two determinations?
  • The section titled Part 3 - Execution describes what?
  • What is the Broad Level 1 designation for Masonry?
  • Minor Changes in Work
  • The Execution section includes which action?
  • Which part covers installation or application?
  • MasterFormat is best known for what organizational structure?
  • Which organization is associated with Supplemental Instructions in the material?
  • Which item is explicitly identified as a UniFormat example in the material?
  • What term denotes the maximum limit of liability payable?
  • Shop Drawings are prepared by which entities?
  • Which policy is a broad form of business insurance excluding automobiles?
  • Which of the following is one of the Six Project Delivery Methods?
  • Who must adhere to the contractor's safety rules on the site?
  • Which topic is included in Part 1 - General?
  • Which term describes documentation that shows construction-related information not indicated in the contract?
  • Capacity is an element of a contract. Which option best identifies it?
  • Which entity determines Substantial and Final Completion?
  • In a Bid Form, Acknowledgements typically capture what?
  • Which statement best differentiates a Bid from a Proposal?
  • Nonscaled views include which items?
  • Project Record Document includes which items?
  • Facility Services Subgroup covers which section range?
  • Which are the two methods for preparing written changes?
  • BEES is a design tool used for building products and is developed by which agency?
  • What is PageFormat?
  • Who is responsible for protecting public health, safety and welfare?
  • Which UniFormat code relates to Roofing?
  • What term describes the overall process from concept through deconstruction?
  • An owner claim occurs when the owner believes value of work is not commensurate with contract price.
  • What describes a Project Schedule?
  • Which insurance indemnifies a person with an interest in physical property?
  • What is an Express Warranty?
  • Which party is responsible for construction administration, evaluation services, certifying applications for payment, and final inspection of work?
  • What are the deliverables of Schematic Design?
  • Contract Documents include all items except which?
  • A submittal is defined as:
  • What is an Allowance?
  • Substantial Completion is best described as which of the following?
  • Which method is used to prepare the Construction Budget?
  • A contractor claim arises when conditions are what?
  • Which guide outlines phases including Conceptualization, Criteria Design, Detailed Design, and Implementation Document?
  • GreenFormat provides a standard format for identifying and organizing the reporting of sustainability features of products and works in conjunction with which master standard?
  • Which term refers to insurance for loss or damage to a building under construction?
  • Which statement about record drawings is true?
  • Fire Suppression and HVAC are part of which Subgroup?
  • Testing reports are typically included in which type of submittal?
  • What is an Action Submittal?
  • Correction Period: Typically how long is the period?
  • Which items are typically included in an Action Submittal?
  • Which statement best describes the relationship between Hard Costs and Soft Costs?
  • Contractor has limited authority to stop work under which condition?
  • During the correction period, what remains in place?
  • What is the primary purpose of GreenFormat?
  • Which section range within the Site and Infrastructure Subgroup is reserved?
  • Field Orders are associated with which organization in the material?
  • Which of the following best describes what drawings show in construction documents?
  • Which description best matches Preliminary Project Description?
  • A lien is best defined as:
  • Which party is responsible for paying taxes in the contract?
  • Value Analysis is also known as which term?
  • Autonomy to Contract means what?
  • Which statement best defines Inspection in this context?
  • What does a Performance Bond guarantee?
  • Division 01 General Requirements relate to other divisions how?
  • The BEES model life cycle analysis includes estimates of cumulative environmental impacts over all stages of a product life cycle over what period?
  • A Drawing is defined as which of the following?
  • Which term best describes Tangible components such as site work, construction, furniture, furnishings, and equipment?
  • Which clause in contract documents ensures that representations, indemnifications, warranties, and guarantees survive after termination?
  • What do Specifications define?
  • What is the Narrow Level 3 designation for Brick Masonry?
  • The Energy Star program administered by the EPA serves what primary purpose?
  • Which item is listed under the Facility Construction Subgroup?
  • Under Fast Track, what construction approach is described?
  • Change Order is
  • What does a Bid Bond protect against?
  • What is a Hold-Harmless Agreement?
  • Which term best describes all work ceasing with the contractor not being paid?
  • Final Completion is achieved when which conditions are met?
  • Which term means the right to recover from one legally liable?
  • Which of the following is NOT listed as an element of a contract?
  • UniFormat is a uniform classification system used to organize preliminary construction information on the basis of what?
  • Which project delivery concept is described by 'Fast Track'?
  • Scaled views include which items?
  • How do contract drawings differ from record drawings?
  • AIA is associated with which document type in the material?
  • Combined bids refer to which concept?
  • Green Buildings aim to do what?
  • Which best defines Quality Assurance?
  • EJCDC is associated with which document type in the material?
  • Which drawing type illustrates objects as they appear to the eye, with reference to distance and depth?
  • Which section range is reserved within the Facility Construction Subgroup?
  • Who bears the responsibility for paying taxes?
  • Which drawing type shows horizontal and vertical surfaces foreshadowed in all three dimensions, not in perspective?
  • Which document type is paired with AIA according to the material?
  • Division 10 handles which category?
  • During occupancy, which entities maintain and evaluate the project performance and determine suitability for continuing use?
  • During which phase may the Owner file claims for latent defects?
  • What is the primary purpose of record drawings?
  • A Bid is best described as which of the following?
  • OmniClass is best described as which of the following?
  • Which term describes insurance specifically for a construction project to cover the building under construction?
  • In the project process, which role must continually inspect the work to ensure each portion is ready for the next phase?
  • Which division is associated with Special Construction?
  • Which UniFormat code corresponds to Exterior Doors?
  • Section 04 21 13.13 covers which material?
  • In Part 2 - Products, which term is explicitly associated with quality control?
  • Which contract element involves the formalization of the agreement with the parties’ signatures?
  • Which concept involves restoring a victim of loss by payment, repair, or replacement?
  • Who establishes the Substantial Completion date?
  • Which contract document binds the signing parties to the work?
  • Final Payment refers to what process in a contract?
  • Division 13 is associated with which construction category?
  • What does the Uniform Commercial Code govern?
  • Which contract element denotes the meeting of the minds on terms?
  • Which term means to restore the victim of a loss by payment, repair, or replacement?
  • How is the Facility Life Cycle defined?
  • What is a Dispute as defined in the material?
  • Which condition justifies Withholding Payments?
  • Which best describes Total Project Commissioning?
  • The statement 'Contractor must continually inspect work to ensure each portion is ready for the subsequent portion' best describes which practice?
  • Which document is typically used to provide a cost breakdown by value and is prepared by the Contractor?
  • What is the primary mandate of the Authorities Having Jurisdiction (AHJ)?
  • If unresolved claims escalate, what is a common next step?
  • Which event commonly triggers a change in contract price or contract time?
  • Who has the authority to stop work without cause?
  • Procurement Documents include all procurement-related items except which?
  • Which of the following defines a Claim in this context?
  • In insurance terms, which right allows recovery from the liable party after payment of a claim?
  • Who prepares the Schedule of Values?
  • What is an Informational Submittal?
  • What term describes the cause of a loss, such as fire, windstorm, or explosion?
  • Which GreenFormat section would cover Product Life Cycle information?
  • What does a Payment Bond guarantee?
  • Substitutions should not be considered when the request is an RFI.
  • Assignment occurs when one party legally assigns their role and responsibilities to a third party (per AIA General Conditions).
  • What two aspects constitute the dual nature of design?
  • Trade Customs may be relied upon by a court when what occurs?
  • Which are the two implied warranties mentioned?
  • Final Payment is made after which milestone?
  • Which statement best describes General Conditions in construction documents?
  • What is the primary use of UniFormat as illustrated by the examples?
  • In the Bid Form, what does the Closing section address?
  • Construction Change Directive is
  • Which term should be avoided in Specification Text as per the material?
  • Unit Price is defined as?
  • Which pairing is shown as correct in the material?
  • Advertisement to Bid is defined as?
  • Environmental performance assessment in sustainable design is evaluated at which level(s)?
  • Which items are typically included in Soft Costs?
  • Remedy for Breach is an element of a contract. Which option is the correct label?
  • Document Relationships indicate Construction Documents are described as including which of the following?
  • Which drawing type is prepared by manufacturers, suppliers, subcontractors, and contractors to illustrate a portion of the work and is not a contract drawing?
  • Which of the following is NOT true about Addenda?
  • Which term is defined as to examine carefully and for defects?
  • Which group name is part of MasterFormat Groups and specifically relates to procurement and contracting requirements?
  • Which statement best aligns with a Business Information Model?
  • What best defines contract drawings?
  • Which instrument involves assuming legal liability of one party by another?
  • Which activities are included in Project Conception?
  • Which division handles Specialties?
  • Which phrases should be avoided in Specification Text?
  • Who is obligated for correction and warranty during Post-Final Completion?
  • In Procurement (Bidding/Negotiating/Purchasing), what results in award of a contract?
  • How is the Project Budget different from the Construction Budget?
  • Which two bonds are designed to guarantee both performance and payment?
  • Indemnity in contract law means to:
  • What does 'Furnished by the Owner' refer to?
  • In scaled views, which statement about Detail is correct?
  • What do Periodic Progress Payments not indicate?
  • The BEES model life cycle analysis is primarily described as what type of assessment?
  • A Proposal is best described as which of the following?
  • Which contract element represents honesty and fair dealing in performance?
  • The implied warranties referenced include merchantability and fitness for a particular purpose. Which statement best reflects this?
  • Which best defines Quality Control in construction documentation context?
  • Which option best defines a Project Budget?
  • How is a Lien best described in construction contracts?
  • Which term means to perceive, notice, see?
  • Contract Document Modifications include which items?
  • Sustainable Design focuses on the environmental performance of the facility over its life cycle, and this assessment takes place at what level?
  • What is the purpose of a Final Change Order?
  • Suspension by Owner for Convenience typically results in changes to what?